The Building Process

Typically ~15 weeks after design freeze and required approvals, subject to project conditions. Site preparation starts W3 — running in parallel with factory production and sea freight to cut months off traditional timelines.

Typically ~15 weeks (after design freeze & approvals)
·vs 12–24 months traditional
·4 stages
·Site prep starts W3 — parallel to factory & sea freight

Parallel Timeline — The ICG Advantage

⚡

Transport + Site Prep run in parallel — saving 4–6 weeks

Tap any row to jump to that stage. Timeline is illustrative; actual duration subject to project conditions.

Stage 15 weeks

Factory Production

Precision-built in controlled environment

Modules are precision-manufactured in a weather-controlled factory environment across 5 weeks. Quality checks happen at every stage. NCC, NatHERS, BAL, and WaterMark requirements are addressed in the system design — final project compliance remains subject to site-specific design, installation, inspection and approval. Site preparation begins at W3 while factory production is still underway.

Site preparation begins at W3 — overlapping with factory production before modules even leave the factory

TraditionalOn-site construction affected by weather, labour shortages, and supply chain delays — 6–12 months typical

Stage 25 weeks sea freight (W6–W10) · 8 weeks site prep (W3–W10)

Sea Freight & Site Prep

ICG's parallel advantage — sea freight + site prep run together

Completed modules are sea-freighted over 5 weeks (W6–W10). Site preparation runs for 8 weeks (W3–W10) — starting while factory production is still underway — covering land clearing, utility connections (water, power, sewerage), foundation layout, and access preparation. By the time modules arrive, the site is ready.

Site prep starts W3 — overlapping factory production AND sea freight, saving ~8 weeks vs sequential build

TraditionalSequential — materials arrive first, then site prep begins. Adds months to the timeline

Stage 34 weeks

Installation

Crane assembly, fit-out & services in one mobilisation

With the site fully prepared and modules arrived, installation takes 4 weeks. Crane lifts modules into precise position, structural connections are made, interior and exterior finishing is completed, and all utilities (electricity, plumbing, gas) are connected by licensed tradespeople — all in a single site mobilisation.

TraditionalStructural frame, wet trades, fit-out, and services each require separate scheduling — adds months

Stage 4~1 week

OC & Turnkey

Final inspection, OC issued, keys handed over

A thorough quality inspection covers every system and finish. The building certifier issues the Occupation Certificate (OC). Full documentation package provided: structural certifications, energy ratings, and compliance statements. Your building is ready.

TraditionalAdmin and inspection delays commonly push OC out by weeks — adding cost and holding finance