Available in Queensland

Build More.Build Faster.Build Right.

NCC-compliant modular building systems for Queensland developers, builders, and social housing projects.

Explore Products
0 wks+
Typical Delivery (after design freeze & approvals)
0+
Modules Delivered
0★
NatHERS Rating
0
State — Queensland
The Complete Build

Factory to Handover — Uncut

Scroll through each stage of the build process

Factory Production
Tap a stage to jump
A Leading Modular Building System Provider in Queensland

Designed and Manufactured to Applicable Australian Standards

The system is supported by independent assessments and compliance documentation, including BEAL Appraisal BS2318 and WaterMark Licence 060175. Designed and manufactured to applicable Australian Standards within the documented scope of the system.

Our Products

Three model ranges, all NCC-compliant and available in Queensland.

Queensland
Coming Soon

ICG-S75

1 Bed|1 Bath|75m²
NatHERS 7★ ref.BAL-capable
Coming Soon
Queensland
Coming Soon

ICG-M105

2 Bed|1 Bath|105m²
NatHERS 7★ ref.BAL-capable
Coming Soon
Queensland
Coming Soon

ICG-L135

3 Bed|2 Bath|135m²
NatHERS 7★ ref.BAL-capable
Coming Soon
NCC Compliant Building System

Australian Standard Is Everything

Developers and councils in Australia require full AS compliance before any certificate is issued. Factory-manufactured components are produced to assessed system documentation and approved drawings; final project compliance remains subject to site-specific design, installation, inspection and approval.

01

Compliance Documentation

The system is supported by independent assessments and compliance documentation, including BEAL Appraisal BS2318 and WaterMark Licence 060175. Each document applies to the specified product, scope and conditions.

02

Council-Ready Documentation

Standardised technical documentation may reduce duplicated information requests, subject to the applicable approval pathway and project circumstances. Full compliance documentation available upon request.

03

Private Certification Pathway

Private building certification pathway is available, subject to applicable planning requirements. Standardised documentation may support faster information exchange with certifiers.

Sustainable by Design

Low carbon is a whole-life strategy, not a marketing label

From material selection and factory manufacturing through to operations and legacy conversion — the ICG system is designed for energy efficiency, supporting EPD product data and building LCA baseline assessment.

View full technical specs →

Rooftop solar + battery storage (BESS) — grid-resilient microgrid

Heat-pump hot water — significantly more energy-efficient than electric resistance

Sub-metering per unit — track energy and water consumption in real time

Factory manufacturing cuts construction waste vs on-site builds by design

Post-use convertible: student housing, key-worker or affordable housing

Australia's 82% renewable electricity target by 2030 — we're already aligned

Why Modular?

Compare what modular construction delivers versus traditional on-site builds.

Delivery Timeline
Traditional Build
6–12 months
ICG Modular
Typically 15–17 weeks (after design freeze & approvals)
Weather Exposure
Traditional Build
High — site-built
ICG Modular
Minimal — factory-built
Cost Predictability
Traditional Build
Variable, frequent overruns
ICG Modular
Fixed-price components for defined scope (exclusions stated in contract)
Scale Delivery
Traditional Build
Linear — one by one
ICG Modular
Production capacity supports parallel manufacture of multiple units
Market Context

Why Australia's housing crisis makes modular construction a necessity

1.2M

New homes needed by 2029 under the National Housing Accord — Australia's most ambitious housing target ever

50K+

Annual housing shortfall — completions consistently falling short of the 240,000-per-year target

3×

Faster than traditional construction — modular homes typically complete significantly faster than 9–12 months on site (subject to project conditions)

Ready to scale your next development?

Talk to our team about your project requirements, timeline, and volume needs.

Start a Conversation